top of page

School Hall

Scope:

Interior retrofit

Year:

2019-2020

Photography:

Juliana Chan (author)

The team won the tender project - given design brief to tidy up and conceal electrical components and to give a face lift to the school hall with new mural art to replace the old.

​The existing site conditions posed various challenges to integrate all the existing components such as the large posters, air condition units, fans and electrical trunking. A bold decision was made to build up a 8m high wall partition for the front elevation to make a large artwork feature. Other partitions had to work around the existing air-condition units and signages. Due to budget constraints, we creatively “choreographed” the digital artwork with the rest of the wall painting and die-cut stickers to achieve a seamless and "continuous" landscape effect throughout the hall.

We transformed the typical hard-scape of the school hall into a greener and "softer" landscape that embraces the central hall where most students assemble and enjoy their activities - to be one with nature.

[Copyrights: ACG Design Studio | ACG Construction Pte Ltd]

bottom of page